Interested in following along as we build our next new custom home?

6-13-15
If so, please be our guest and follow along as we share the step-by-step process of building a new custom home on our blog. We recently started our next build in Batavia Ohio on the east side of Cincinnati. An existing turn-of-the-century home beyond repair was used as a controlled burn by the fire department then the debris’s were hauled away. 

BB blog photos-001

First up we had the new house location staked off then the basement, garage and porch areas were excavated. Prior to the dig our excavator scraped off all the topsoil and placed it in a pile to redistribute during the final grade. After the excavating our foundation crew installed the footers that will support the foundation and house walls. 

BB blog photos-005

After the footers we installed perforated 4″ flexible drain tile pipe inside and outside of the footers with additional pipe going through the footers every 10’or so. The drain tile is hooked up to a crock which will eventually hold a sump pump in order to remove any groundwater from around the footers. This lot also accommodated a gravity drain which was hooked up to the drain tile and allows water to move downhill by gravity and away from the foundation.  The drain tile pipe will then be covered over by gravel and ready for the foundation walls to be installed.

BB blog photos-006

 

 

 

 