Follow Along As We Build Our Next New Custom Home,

After the foundation walls were installed a rubber waterproofing membrane was applied to the exterior. Then approximately 2 feet of 1″gravel was applied over the exterior drain tile then covered over with a mesh material before backfilling. The mesh allows proper waterflow to the drain tile keeping dirt in other materials from entering.

blog-002

Basement rough-in plumbing, steel post and beans followed by concrete slabs in the basement and garage where then completed. The lumber package was then delivered and house framing started shortly after.

blog-007

The basement walkout and first floor framing is complete.

blog-009

Kitchen nook bay windows.

blog-003

The trusses arrived and with the assistance of a crane were installed shortly after.

blog-018 blog-017 blog-012 blog-010

 

After the roof sheeting was installed our roofers applied a 30 pound felt along with 30 year dimensional shingles.

blog-033 blog-025 blog-027

Next will be HVAC, plumbing, electric, insulation and drywall.